1)Cable route inspection by Diver 2)Geo-physical survey 3)Monitoring by RADAR 4)Patrol Boat operation
Jindo-Jeju 154kV HVDC Pole#2 at KP6.8~7.2 De-burial and Recovery of Cable
[KEPCO]
1)De-burial of three bundled cables(2 MI + 1 Fiber optic cable) protected with rock berm 2)Recovery of cables for scrap
Recovery of Sewol-ho (cruise vessel)
[Korea Ministry of Ocean and Fishery]
1) Recover remaining oil in the wreck 2)Recover the wreck 3)Deliver it to onshore
Jindo-Jeju 154kV HVDC Pole#2 at KP6.8~7.2 De-burial and Recovery of Cable
[KEPCO]
1)De-burial of three bundled cables(2 MI + 1 Fiber optic cable) protected with rock berm 2)Recovery of cables for scrap
Venezuela 230Kv Submarine Power Cable Installation
[Corpoelec (Vene.)]
1)Cable laying for 64Km between Margarita and Chacopata in Venezuela 2)Cable landing 3)Shore-end protection with burial and sand bag 4)X-point protection with concrete mattress
Jindo-Jeju 154kV HVDC Pole#2 Protection
[KEPCO]
Cable protection with Rock Berm at repair segment
Jindo-Jeju 154kV HVDC Pole#2 Cable Repair at KP6.2 ~ 6.9
[KEPCO]
1)Fault Location Finding with TDR 2)Cable repair (recover, jointing and laying) 3)Cable Test with TDR
Earthquake & tsunami monitoring system
[KHOA]
Install the submarine system in the East Sea (W.D : Approx.1500m)
Submarine Power Cable Installation for Young-do Bridge between Busan and Young-do Island
[Lotte Construction]
1)Cable Pulling to tower through casting tube 2)Cable Termination 3)Cable Test