2018 |
22.9kV Seo-nam-hae Wind Farm Project |
1) Submarine Cable Laying 2)Submairne Cable Protection 3) J-tube, hang off, etc |
2018.10 ~ 2020.03 |
KEPCO |
2018 |
Jindo-Jeju 154kV HVDC Cable Protection with Rock Berm |
1) Submarine Cable Protection(Rock Berm method) 2)Engineering and manufacturing Tremi System 3)Real time monitoring |
2018.08 ~ 2019.08 |
KEPCO/LS Cable |
2016 |
Haenam-Jeju 154kV HVDC Submarine Cable Maintenance |
1)Cable route inspection by Diver 2)Geo-physical survey 3)Monitoring by RADAR 4)Patrol Boat operation |
2016.03 ~2016.12 |
KEPCO |
2015 |
Jindo-Jeju 154kV HVDC Pole#2 at KP6.8~7.2 De-burial and Recovery of Cable |
1)De-burial of three bundled cables(2 MI + 1 Fiber optic cable) protected with rock berm 2)Recovery of cables for scrap |
2015.01 ~ 2015.03 |
KEPCO |
2015 |
Recovery of Sewol-ho (cruise vessel) |
1) Recover remaining oil in the wreck 2)Recover the wreck 3)Deliver it to onshore |
2015.08 ~2017.12 |
Korea Ministry of Ocean and Fishery |
2014 |
Venezuela 230Kv Submarine Power Cable Installation |
1)Cable laying for 64Km between Margarita and Chacopata in Venezuela 2)Cable landing 3)Shore-end protection with burial and sand bag 4)X-point protection with concrete mattress |
2014.05 ~ 2014.12 |
Corpoelec (Vene.) |
2014 |
Jindo-Jeju 154kV HVDC Pole#2 Protection |
Cable protection with Rock Berm at repair segment |
2014.02 ~ 2014.03 |
KEPCO |