skip navigation main menu navigation

Track Record

Track Record

Track Record
Year Project Description Period Client
2018 22.9kV Seo-nam-hae Wind Farm Project 1) Submarine Cable Laying 2)Submairne Cable Protection 3) J-tube, hang off, etc 2018.10 ~ 2020.03 KEPCO
2018 Jindo-Jeju 154kV HVDC Cable Protection with Rock Berm 1) Submarine Cable Protection(Rock Berm method) 2)Engineering and manufacturing Tremi System 3)Real time monitoring 2018.08 ~ 2019.08 KEPCO/LS Cable
2016 Haenam-Jeju 154kV HVDC Submarine Cable Maintenance 1)Cable route inspection by Diver 2)Geo-physical survey 3)Monitoring by RADAR 4)Patrol Boat operation 2016.03 ~2016.12 KEPCO
2015 Jindo-Jeju 154kV HVDC Pole#2 at KP6.8~7.2 De-burial and Recovery of Cable 1)De-burial of three bundled cables(2 MI + 1 Fiber optic cable) protected with rock berm 2)Recovery of cables for scrap 2015.01 ~ 2015.03 KEPCO
2015 Recovery of Sewol-ho (cruise vessel) 1) Recover remaining oil in the wreck 2)Recover the wreck 3)Deliver it to onshore 2015.08 ~2017.12 Korea Ministry of Ocean and Fishery
2014 Venezuela 230Kv Submarine Power Cable Installation 1)Cable laying for 64Km between Margarita and Chacopata in Venezuela 2)Cable landing 3)Shore-end protection with burial and sand bag 4)X-point protection with concrete mattress 2014.05 ~ 2014.12 Corpoelec (Vene.)
2014 Jindo-Jeju 154kV HVDC Pole#2 Protection Cable protection with Rock Berm at repair segment 2014.02 ~ 2014.03 KEPCO
TOP